backfilling stroke

简明释义

背面上浆刮程

英英释义

A backfilling stroke refers to the process of refilling an excavated area or cavity, typically with soil or other materials, to restore the original ground level or to provide support for structures.

回填动作是指用土壤或其他材料填充挖掘区域或空腔的过程,通常用于恢复原来的地面高度或为结构提供支撑。

例句

1.The backfilling stroke must be performed evenly to avoid settling issues later.

必须均匀执行回填行程以避免后期沉降问题。

2.In our training session, we practiced the correct technique for the backfilling stroke.

在我们的培训课程中,我们练习了回填行程的正确技术。

3.The operator adjusted the machine to optimize the backfilling stroke for better efficiency.

操作员调整了机器以优化回填行程以提高效率。

4.We need to calculate the volume of soil displaced by each backfilling stroke.

我们需要计算每个回填行程所排出的土壤体积。

5.During the excavation process, the backfilling stroke was crucial to ensure stability.

在挖掘过程中,回填行程对确保稳定性至关重要。

作文

In the world of construction and engineering, various terms are used to describe specific processes and techniques. One such term is backfilling stroke, which refers to the action of filling an excavated area with material after the initial construction work has been completed. This process is crucial for ensuring stability and support for structures, as well as for preparing the site for further development. Understanding the significance of the backfilling stroke is essential for anyone involved in construction projects, from engineers to laborers.The backfilling stroke typically involves the use of machinery to transport and place soil or other materials back into the excavation. This step is not merely about filling a hole; it requires careful consideration of the type of material used, the moisture content, and the compaction needed to prevent future settling. For instance, if the wrong type of soil is used or if it is not compacted properly, it can lead to problems such as sinkholes or uneven surfaces, which can compromise the integrity of the structure being built.Moreover, the timing of the backfilling stroke is also critical. It usually occurs after the foundation has been laid and any necessary inspections have been completed. Rushing this process can lead to mistakes that may not be immediately visible but can cause significant issues down the line. Therefore, project managers must ensure that all necessary precautions and procedures are followed during the backfilling stroke to avoid potential complications.Another aspect to consider is the environmental impact of the backfilling stroke. Construction projects often require large amounts of materials, which can lead to habitat destruction if not managed properly. Sustainable practices should be implemented to minimize damage to the surrounding environment. This includes sourcing materials locally when possible and reusing excavated soil rather than disposing of it, which can also reduce costs.In addition to its physical implications, the backfilling stroke has legal considerations as well. Many regions have regulations governing construction practices, including how backfilling should be conducted. Compliance with these regulations is essential to avoid fines and ensure the safety of the construction site. Contractors must be knowledgeable about local laws and guidelines related to the backfilling stroke to maintain good standing and protect their reputation.Furthermore, the backfilling stroke is often a collaborative effort involving various professionals. Engineers, architects, and construction workers must communicate effectively to ensure that the process is executed correctly. Regular meetings and updates can help keep everyone on the same page, reducing the likelihood of errors during this critical phase of construction.In conclusion, the term backfilling stroke encapsulates a vital part of the construction process that goes beyond simply filling a hole. It involves careful planning, execution, and consideration of various factors, including material selection, timing, environmental impact, and legal compliance. By understanding the intricacies of the backfilling stroke, construction professionals can contribute to more successful projects that stand the test of time.

在建筑和工程领域,使用各种术语来描述特定的过程和技术。其中一个术语是回填动作,指的是在初步施工工作完成后,用材料填充挖掘区域的行为。这个过程对于确保结构的稳定性和支撑性,以及为进一步开发准备工地至关重要。理解回填动作的重要性对于任何参与建筑项目的人来说都是必不可少的,从工程师到工人。回填动作通常涉及使用机械将土壤或其他材料运输并放置回挖掘坑中。这一步骤不仅仅是填补一个洞;它需要仔细考虑所用材料的类型、湿度以及防止未来沉降所需的压实。例如,如果使用了错误类型的土壤,或者没有适当压实,可能会导致诸如塌陷或不平坦的表面等问题,这可能会危及正在建设的结构的完整性。此外,回填动作的时机也至关重要。它通常发生在基础铺设完毕并完成所有必要检查之后。急于进行这一过程可能会导致错误,这些错误可能不会立即显现,但会在后期造成重大问题。因此,项目经理必须确保在回填动作过程中遵循所有必要的预防措施和程序,以避免潜在的并发症。另一个需要考虑的方面是回填动作对环境的影响。建筑项目通常需要大量材料,如果管理不当,可能会导致栖息地破坏。应实施可持续实践,以尽量减少对周围环境的损害。这包括尽可能就地采购材料和重用挖掘的土壤,而不是处理掉这些土壤,这也可以降低成本。除了其物理影响外,回填动作还有法律方面的考虑。许多地区都有关于建筑实践的法规,包括如何进行回填。遵守这些法规对于避免罚款和确保施工现场的安全至关重要。承包商必须了解与回填动作相关的地方法律和指南,以维护良好的信誉并保护自己的声誉。此外,回填动作通常是一个涉及各种专业人士的协作努力。工程师、建筑师和建筑工人必须有效沟通,以确保该过程正确执行。定期会议和更新可以帮助让每个人保持一致,从而降低在这一关键施工阶段出现错误的可能性。总之,术语回填动作概括了建筑过程中一个至关重要的部分,它不仅仅是填补一个洞。它涉及仔细的规划、执行和对各种因素的考虑,包括材料选择、时机、环境影响和法律合规。通过理解回填动作的复杂性,建筑专业人员可以为更成功的项目贡献力量,使其经得起时间的考验。

相关单词

backfilling

backfilling详解:怎么读、什么意思、用法