Per Workable Hatch

简明释义

按可作业的舱口

英英释义

Per Workable Hatch refers to a specific measurement or allocation in a system, often used in contexts such as shipping or logistics, indicating the number of items or units that can be effectively managed or processed through a designated hatch or opening.

每个可操作舱口是指在一个系统中的特定测量或分配,通常用于运输或物流等上下文,表示可以通过指定的舱口或开口有效管理或处理的物品或单位的数量。

例句

1.We will distribute the resources Per Workable Hatch to ensure maximum efficiency.

我们将根据可行的舱口分配资源,以确保最大效率。

2.We will evaluate the performance metrics Per Workable Hatch at the end of each quarter.

我们将在每个季度末根据可行的舱口评估绩效指标。

3.The team decided to implement changes Per Workable Hatch to streamline the process.

团队决定根据可行的舱口实施变更,以简化流程。

4.The budget allocation will be adjusted Per Workable Hatch based on project needs.

预算分配将根据项目需求进行调整,可行的舱口

5.Our project timeline is structured Per Workable Hatch to accommodate any unforeseen delays.

我们的项目时间表是根据可行的舱口结构,以适应任何不可预见的延误。

作文

In the world of engineering and design, specific terminology often plays a crucial role in ensuring that everyone involved has a clear understanding of the processes and requirements at hand. One such term that is frequently encountered in various fields, especially in maritime and aerospace industries, is Per Workable Hatch. This phrase refers to the standard or guideline that dictates how many units or components can be effectively managed or utilized through a designated access point, typically a hatch or opening. Understanding this term is essential for optimizing operations and ensuring safety in environments where space and access are limited.The concept of Per Workable Hatch can be illustrated through a practical example in shipbuilding. When constructing a vessel, engineers must consider how materials and personnel will be transported in and out of the ship. The hatches serve as critical points of access, and the term Per Workable Hatch helps to define the maximum load or number of workers that can safely operate through each hatch at any given time. This ensures that the workflow remains efficient while also adhering to safety regulations, preventing overcrowding and potential accidents.Moreover, the application of Per Workable Hatch extends beyond the maritime industry. In aerospace, for instance, during the assembly of aircraft, technicians must work through specific access points to install components. Each hatch has its limitations, and understanding the Per Workable Hatch guideline allows teams to plan their assembly processes more effectively. By knowing how many individuals can work through a hatch simultaneously, project managers can allocate resources better and schedule tasks to avoid bottlenecks in production.Additionally, the term Per Workable Hatch can also be relevant in emergency situations. For example, in a disaster recovery scenario, knowing how many people can evacuate through a hatch safely can be a matter of life and death. Emergency responders must be trained to recognize these limits to facilitate quick and safe evacuations, ensuring that everyone can exit the premises without risking injury or chaos.Understanding Per Workable Hatch is not just about numbers; it encompasses a broader awareness of spatial dynamics and human factors in design and operation. Engineers and designers must consider not only the physical dimensions of hatches but also the nature of the tasks being performed. For instance, carrying large or awkwardly shaped items may reduce the effective capacity of a hatch, thereby necessitating adjustments in planning and execution.In conclusion, the phrase Per Workable Hatch serves as a vital guideline in various industries that rely on precise access and workflow management. Its implications reach far beyond mere numbers, influencing safety protocols, operational efficiency, and overall project success. By grasping the significance of this term, professionals can enhance their effectiveness and contribute to safer and more productive work environments. Whether in shipbuilding, aerospace, or emergency management, the principles underlying Per Workable Hatch remain universally applicable, underscoring the importance of thoughtful design and careful planning in all aspects of engineering and operations.

在工程和设计的世界中,特定术语通常在确保参与者对手头的流程和要求有清晰理解方面起着至关重要的作用。其中一个在各种领域,特别是在海事和航空航天工业中经常遇到的术语是Per Workable Hatch。这个短语指的是通过指定的进入点(通常是舱口或开口)可以有效管理或利用多少单位或组件的标准或指南。理解这个术语对于优化操作和确保在空间和访问受限的环境中的安全至关重要。Per Workable Hatch的概念可以通过船舶建造中的一个实际例子来说明。在建造船只时,工程师必须考虑材料和人员如何进出船舶。舱口作为关键的进入点,而Per Workable Hatch这一术语帮助定义在任何给定时间内每个舱口可以安全操作的最大负载或工人数。这确保了工作流程保持高效,同时遵守安全法规,防止拥挤和潜在的事故。此外,Per Workable Hatch的应用超出了海事行业。在航空航天领域,例如,在飞机组装过程中,技术人员必须通过特定的进入点进行组件安装。每个舱口都有其限制,理解Per Workable Hatch的指南使团队能够更有效地规划其组装过程。通过知道同时可以通过舱口工作的人员数量,项目经理可以更好地分配资源并安排任务,以避免生产中的瓶颈。此外,Per Workable Hatch一词在紧急情况下也可能相关。例如,在灾后恢复场景中,了解多少人可以安全地通过舱口撤离可能是生死攸关的问题。紧急响应人员必须经过培训,以识别这些限制,以便快速安全地撤离,确保每个人都能在不冒风险受伤或混乱的情况下退出场所。理解Per Workable Hatch不仅仅是关于数字;它还包含了对设计和操作中空间动态和人因因素的更广泛意识。工程师和设计师必须考虑舱口的物理尺寸以及正在执行任务的性质。例如,携带大型或形状不规则的物品可能会减少舱口的有效容量,从而需要在规划和执行中进行调整。总之,短语Per Workable Hatch作为各行各业的关键指南,对于依赖精确进入和工作流程管理的行业来说至关重要。它的影响远远超出了简单的数字,影响着安全协议、操作效率和整体项目成功。通过掌握这一术语的重要性,专业人士可以提高他们的有效性,并为更安全、更高效的工作环境做出贡献。无论是在船舶建造、航空航天还是紧急管理中,Per Workable Hatch背后的原则在普遍适用,强调了在工程和操作的各个方面进行深思熟虑的设计和仔细规划的重要性。

相关单词

per

per详解:怎么读、什么意思、用法

workable

workable详解:怎么读、什么意思、用法

hatch

hatch详解:怎么读、什么意思、用法