initial deflection of derrick

简明释义

吊杆初挠度

英英释义

The initial deflection of a derrick refers to the first measurable deviation or bending of the structure from its original vertical position when subjected to external forces such as wind, load, or other environmental factors.

derrick的初始偏斜是指在受到外部力量(如风、负载或其他环境因素)作用时,结构相对于其原始垂直位置的第一次可测量的偏离或弯曲。

例句

1.During the inspection, the technician measured the initial deflection of derrick 起重机的初始偏转 to evaluate its performance.

在检查过程中,技术员测量了起重机的初始偏转以评估其性能。

2.Monitoring the initial deflection of derrick 起重机的初始偏转 is crucial for structural integrity assessments.

监测起重机的初始偏转对于结构完整性评估至关重要。

3.The engineer noted the initial deflection of derrick 起重机的初始偏转 during the load test to ensure safety.

工程师在负载测试中注意到起重机的初始偏转,以确保安全。

4.A significant initial deflection of derrick 起重机的初始偏转 may indicate potential mechanical issues.

显著的起重机的初始偏转可能表明潜在的机械问题。

5.The team recorded the initial deflection of derrick 起重机的初始偏转 before commencing the lifting operation.

团队在开始吊装作业之前记录了起重机的初始偏转

作文

In the field of engineering, particularly in construction and structural design, understanding the mechanics of various components is crucial. One such component is the derrick, which is a type of crane used for lifting heavy loads. The performance and stability of a derrick are significantly influenced by its design and the materials used in its construction. A critical aspect of this performance is the initial deflection of derrick, which refers to the first noticeable bending or displacement that occurs when a load is applied to the structure. This phenomenon is essential to comprehend as it can impact the overall safety and efficiency of construction operations.When a derrick is erected, it must be able to withstand various forces, including wind, gravitational pull from the loads it carries, and any dynamic forces that may arise during operation. The initial deflection of derrick can provide valuable insights into how well the structure will perform under these conditions. Engineers often conduct simulations and calculations to predict this initial deflection, ensuring that the design meets safety standards and operational requirements.Moreover, the initial deflection of derrick can also affect the precision with which loads are lifted and placed. If the deflection is excessive, it may lead to misalignment, causing potential hazards on the construction site. Therefore, understanding this concept is not only important for the integrity of the derrick itself but also for the safety of workers and the success of the project.To mitigate issues related to initial deflection of derrick, engineers may choose specific materials that have high tensile strength and low elasticity. Additionally, the design of the derrick can be optimized to minimize deflection through the use of bracing systems and strategic placement of counterweights. These considerations are vital during the planning phase of any construction project involving derricks.In conclusion, the initial deflection of derrick is a key factor in the structural analysis of cranes and similar lifting devices. It not only indicates the immediate response of the structure to loading but also serves as a predictor of long-term durability and safety. Engineers must take this into account when designing and implementing lifting solutions in construction, ensuring that all factors are considered to promote both efficiency and safety on site. By doing so, they contribute to the successful execution of projects, ultimately leading to safer working environments and more reliable construction practices.

在工程领域,特别是在建筑和结构设计中,理解各种组件的力学原理至关重要。其中一个组件是竖起的吊塔,它是一种用于提升重物的起重机。吊塔的性能和稳定性受到其设计和所用材料的显著影响。这个性能的一个关键方面是初始偏转的吊塔,它指的是在施加负载时发生的第一明显弯曲或位移。理解这一现象非常重要,因为它会影响施工操作的整体安全性和效率。当吊塔竖立时,必须能够承受多种力量,包括风、重力以及在操作过程中可能出现的任何动态力量。初始偏转的吊塔可以提供关于结构在这些条件下表现如何的有价值的见解。工程师通常会进行模拟和计算,以预测这种初始偏转,确保设计符合安全标准和操作要求。此外,初始偏转的吊塔还可能影响提升和放置负载的精确度。如果偏转过大,可能导致对齐不准确,从而在施工现场造成潜在危险。因此,理解这一概念不仅对吊塔本身的完整性重要,而且对工人的安全和项目的成功也至关重要。为了减轻与初始偏转的吊塔相关的问题,工程师可能会选择具有高拉伸强度和低弹性的特定材料。此外,吊塔的设计可以通过使用支撑系统和战略性地放置平衡重来优化,以最小化偏转。这些考虑在涉及吊塔的任何建筑项目的规划阶段都是至关重要的。总之,初始偏转的吊塔是起重机和类似升降设备的结构分析中的关键因素。它不仅指示了结构对负载的即时响应,还作为长期耐久性和安全性的预测指标。工程师在设计和实施建筑中的升降解决方案时,必须考虑这一点,确保所有因素都得到考虑,以促进现场的效率和安全。通过这样做,他们为项目的成功执行做出贡献,最终导致更安全的工作环境和更可靠的建筑实践。

相关单词

initial

initial详解:怎么读、什么意思、用法

deflection

deflection详解:怎么读、什么意思、用法

derrick

derrick详解:怎么读、什么意思、用法