hook load
简明释义
起吊载荷
英英释义
例句
1.The hook load was calculated based on the weight of the materials being lifted.
根据被提升材料的重量计算了吊钩载荷。
2.An increase in the hook load can indicate that something is stuck or caught.
增加的吊钩载荷可能表明某物卡住了或被困住了。
3.The crane operator needs to monitor the hook load to ensure it does not exceed the safe lifting capacity.
起重机操作员需要监控吊钩载荷,以确保其不超过安全提升能力。
4.To prevent equipment failure, it's crucial to keep the hook load within limits.
为了防止设备故障,保持吊钩载荷在限制范围内至关重要。
5.Before lifting, always check the hook load to avoid accidents.
在提升之前,务必检查吊钩载荷以避免事故。
作文
In the world of drilling and lifting operations, the term hook load is crucial for understanding how much weight is being lifted by a crane or a drilling rig. The hook load refers to the total weight that is supported by the hook of the crane or the rig's hoisting system at any given time. This measurement is essential for ensuring safety and efficiency in operations, as exceeding the hook load capacity can lead to equipment failure or accidents. To illustrate the importance of hook load, consider a construction site where a crane is used to lift heavy materials such as steel beams and concrete blocks. The operator must constantly monitor the hook load to ensure that it does not exceed the crane's rated capacity. If the hook load becomes too high, it could cause the crane to tip over or the cable to snap, resulting in potentially catastrophic consequences.Moreover, the hook load can vary during operations due to factors such as wind, the angle of the lift, and the type of material being lifted. For instance, when lifting a load at an angle, the effective hook load may increase, putting additional stress on the crane. Therefore, operators must be well-trained and equipped with the right tools to calculate and monitor the hook load accurately.In addition to safety concerns, understanding hook load is also vital for operational efficiency. Accurate measurements of hook load allow operators to plan lifts more effectively, minimizing downtime and maximizing productivity. For example, if an operator knows the exact hook load of a load before lifting, they can choose the appropriate crane and rigging equipment, ensuring that the operation proceeds smoothly.Furthermore, modern technology has introduced various tools and systems to help monitor hook load. Load cells, for example, are devices that can be attached to the crane's hook to provide real-time data on the weight being lifted. This information is invaluable for operators, as it allows them to make informed decisions during lifting operations. By integrating these technologies, companies can enhance their safety protocols and improve overall operational performance.In conclusion, hook load is a fundamental concept in the fields of construction and drilling that cannot be overlooked. It encompasses the total weight supported by the crane or rig at any moment, and understanding its implications is essential for maintaining safety and efficiency. As technology continues to advance, the ability to monitor and manage hook load will become even more critical, ensuring that operations are conducted safely and effectively. Operators and engineers alike must prioritize knowledge of hook load to minimize risks and optimize performance in their respective fields.
在钻井和提升作业的世界中,术语hook load对于理解起重机或钻井设备正在提升的重量至关重要。hook load指的是在任何给定时间内,由起重机的钩子或设备的提升系统支撑的总重量。这个测量对于确保操作的安全性和效率至关重要,因为超过hook load的容量可能导致设备故障或事故。为了说明hook load的重要性,考虑一个使用起重机提升重物(如钢梁和混凝土块)的建筑工地。操作员必须不断监测hook load,以确保其不超过起重机的额定容量。如果hook load过高,可能会导致起重机倾覆或缆绳断裂,从而造成潜在的灾难性后果。此外,由于风、提升角度和被提升材料的类型等因素,hook load在操作过程中可能会有所变化。例如,在以角度提升负载时,有效的hook load可能会增加,给起重机带来额外压力。因此,操作员必须接受良好的培训,并配备正确的工具,以准确计算和监测hook load。除了安全问题,了解hook load对于操作效率也至关重要。对hook load的准确测量使操作员能够更有效地规划提升,最大限度地减少停机时间,提高生产力。例如,如果操作员在提升之前知道负载的确切hook load,他们可以选择合适的起重机和索具设备,确保操作顺利进行。此外,现代技术引入了各种工具和系统,以帮助监测hook load。负载传感器就是一种可以附加到起重机钩子上的设备,用于提供实时数据,显示正在提升的重量。这些信息对操作员来说是无价的,因为它使他们能够在提升操作中做出明智的决策。通过整合这些技术,公司可以增强其安全协议并改善整体操作性能。总之,hook load是建筑和钻井领域中一个基本概念,不能被忽视。它包含了在任何时刻由起重机或设备支撑的总重量,理解其含义对于保持安全性和效率至关重要。随着技术的不断进步,监测和管理hook load的能力将变得更加关键,确保操作安全有效地进行。操作员和工程师都必须优先考虑对hook load的知识,以最小化风险并优化各自领域的表现。