auxiliary steam turbine load turnover test
简明释义
辅汽轮机转移负荷试验
英英释义
例句
1.During the maintenance session, we performed the auxiliary steam turbine load turnover test to ensure the system's reliability.
在维护期间,我们进行了辅助蒸汽涡轮负荷转动测试以确保系统的可靠性。
2.The auxiliary steam turbine load turnover test is crucial for identifying potential issues early in the operation.
进行辅助蒸汽涡轮负荷转动测试对于及早发现潜在问题至关重要。
3.Before commissioning the new turbine, we conducted an auxiliary steam turbine load turnover test as part of our safety protocols.
在投运新涡轮之前,我们按照安全协议进行了辅助蒸汽涡轮负荷转动测试。
4.Engineers must document the findings from the auxiliary steam turbine load turnover test for future reference.
工程师必须记录辅助蒸汽涡轮负荷转动测试的结果以备将来参考。
5.The results of the auxiliary steam turbine load turnover test indicated that the turbine was operating within normal parameters.
辅助蒸汽涡轮负荷转动测试的结果表明涡轮运行在正常参数范围内。
作文
The efficient operation of power plants is crucial for meeting the energy demands of modern society. One of the vital components in thermal power generation is the auxiliary steam turbine. To ensure that these turbines function optimally, various tests are conducted, among which the auxiliary steam turbine load turnover test is particularly significant. This test assesses the performance and reliability of the auxiliary steam turbine under varying load conditions, thereby ensuring that it can respond effectively during operational fluctuations.The auxiliary steam turbine load turnover test involves subjecting the turbine to different load levels while monitoring its performance metrics such as efficiency, temperature, and vibration. This process is essential because auxiliary turbines often support the main turbine during peak loads and help maintain the overall stability of the power generation system. By conducting this test, engineers can identify any potential issues that may arise during normal operation, allowing them to make necessary adjustments before the turbine is put into service.Moreover, the auxiliary steam turbine load turnover test serves as a quality assurance measure. It verifies that the turbine meets the design specifications and operates within the desired parameters. This is particularly important in ensuring safety and reliability, as any malfunction in an auxiliary turbine can lead to significant operational disruptions and economic losses. Therefore, thorough testing is not just a regulatory requirement but also a best practice in the industry.In addition to performance validation, the auxiliary steam turbine load turnover test provides valuable data for future maintenance planning. By analyzing the results from the test, maintenance teams can establish baseline performance indicators. This information is critical for predicting when maintenance should be performed, thus preventing unexpected breakdowns and extending the lifespan of the equipment.Furthermore, the test contributes to the overall efficiency of the power plant. When auxiliary turbines operate correctly, they can enhance the efficiency of the entire system, leading to reduced fuel consumption and lower emissions. This aligns with the global push towards more sustainable energy practices. As power plants strive to minimize their environmental impact, effective performance of auxiliary systems becomes increasingly important.In conclusion, the auxiliary steam turbine load turnover test is a fundamental procedure in the maintenance and operation of thermal power plants. It ensures the reliability and efficiency of auxiliary steam turbines, providing a safeguard against potential failures. By investing time and resources into these tests, power plant operators can optimize their operations, extend the life of their equipment, and contribute to a more sustainable energy future. The importance of such tests cannot be overstated, as they play a critical role in the seamless functioning of power generation systems around the world.
电厂的高效运行对满足现代社会的能源需求至关重要。热电发电中的一个重要组成部分是辅助蒸汽涡轮。为了确保这些涡轮正常运转,进行各种测试,其中辅助蒸汽涡轮负荷周转测试尤为重要。此测试评估辅助蒸汽涡轮在不同负荷条件下的性能和可靠性,从而确保其能够在操作波动期间有效响应。辅助蒸汽涡轮负荷周转测试涉及将涡轮置于不同负荷水平,同时监测其性能指标,如效率、温度和振动。这个过程至关重要,因为辅助涡轮通常在峰值负荷时支持主涡轮,并帮助维持发电系统的整体稳定性。通过进行此测试,工程师可以识别在正常运行中可能出现的任何潜在问题,从而在涡轮投入使用之前进行必要的调整。此外,辅助蒸汽涡轮负荷周转测试作为质量保证措施,验证涡轮是否符合设计规格并在所需参数内运行。这一点对于确保安全和可靠性尤其重要,因为辅助涡轮的任何故障都可能导致重大操作中断和经济损失。因此,全面的测试不仅是监管要求,也是行业中的最佳实践。除了性能验证外,辅助蒸汽涡轮负荷周转测试还为未来的维护计划提供了宝贵的数据。通过分析测试结果,维护团队可以建立基准性能指标。这些信息对于预测何时进行维护至关重要,从而防止意外故障并延长设备的使用寿命。此外,此测试有助于提高电厂的整体效率。当辅助涡轮正常运行时,它们可以提高整个系统的效率,从而减少燃料消耗和降低排放。这与全球推动更可持续能源实践的目标相一致。随着电厂努力最小化其环境影响,辅助系统的有效性能变得越来越重要。总之,辅助蒸汽涡轮负荷周转测试是热电厂维护和运行的基本程序。它确保辅助蒸汽涡轮的可靠性和效率,为防范潜在故障提供保障。通过在这些测试上投入时间和资源,电厂运营商可以优化其操作,延长设备寿命,并为更可持续的能源未来做出贡献。这类测试的重要性不容低估,因为它们在全球范围内发电系统的顺利运行中发挥着关键作用。
相关单词