site work
简明释义
现场工作
英英释义
Site work refers to the activities and tasks performed at a construction site, including excavation, grading, and installation of utilities. | 现场工作是指在建筑工地上进行的活动和任务,包括挖掘、平整和公用设施的安装。 |
例句
1.They hired a subcontractor to handle the site work because they lacked the necessary equipment.
他们雇佣了一家分包商来处理现场工作,因为他们缺乏必要的设备。
2.The weather has delayed the site work, pushing back our timeline significantly.
天气延误了现场工作,大大推迟了我们的时间表。
3.The construction team is currently focused on site work, which involves preparing the ground for the new building.
施工团队目前专注于现场工作,这涉及为新建筑准备地面。
4.The architect visited the location to oversee the site work and ensure everything was going according to plan.
建筑师访问了现场,以监督现场工作并确保一切按计划进行。
5.Before we can start the project, we need to complete all necessary site work for the utilities.
在我们开始项目之前,我们需要完成所有必要的现场工作以便安装公用设施。
作文
In the field of construction and engineering, the term site work refers to all activities that take place on a construction site. This includes everything from the initial preparation of the land to the final touches that make a building ready for use. Understanding site work is crucial for anyone involved in the construction industry, as it encompasses a wide range of tasks that are essential for the successful completion of a project.The first step in site work usually involves surveying the land. This process ensures that the site is suitable for construction and helps identify any potential issues that could arise during the building process. Surveyors use various tools and techniques to measure the land's dimensions and topography, which is vital for creating accurate blueprints.Once the land has been surveyed, the next phase of site work is often clearing the area. This involves removing any trees, shrubs, or debris that may hinder construction. It is important to conduct this step carefully to avoid damaging the environment or disturbing local wildlife. In some cases, permits may be required to remove certain plants or trees, highlighting the importance of adhering to local regulations.After clearing the site, excavation begins. This stage of site work involves digging into the ground to create foundations for buildings, basements, or other structures. Excavation requires heavy machinery and skilled operators to ensure that the work is done safely and efficiently. The depth and dimensions of the excavation depend on the type of structure being built and the soil conditions of the site.Once excavation is complete, the next step is to install utilities such as water, electricity, and sewage systems. This aspect of site work is crucial because it lays the groundwork for how the building will function once completed. Proper installation of these utilities can prevent future issues and ensure the safety and comfort of the occupants.Following the utility installation, the actual construction of the building begins. This is often the most visible part of site work, as workers erect walls, roofs, and other structural elements. During this phase, coordination between different trades is essential. Electricians, plumbers, and carpenters must work together to ensure that their respective installations do not interfere with one another.After the primary structure is complete, the finishing touches are added. This includes interior work like drywall installation, painting, and flooring, as well as exterior work such as landscaping and paving. These final steps of site work are important for both aesthetic appeal and functionality. They transform a raw construction site into a finished building that meets the needs of its users.In conclusion, site work is a comprehensive term that encapsulates all the activities that occur on a construction site. From surveying and clearing the land to excavation and final finishes, each step is critical for the successful completion of a construction project. A thorough understanding of site work allows construction professionals to anticipate challenges and coordinate effectively, ultimately leading to safer and more efficient building practices.
在建筑和工程领域,术语site work指的是在施工现场进行的所有活动。这包括从土地的初步准备到使建筑物准备使用的最后修整。理解site work对任何参与建筑行业的人来说都是至关重要的,因为它涵盖了一系列对项目成功完成至关重要的任务。site work的第一步通常涉及对土地进行测量。这个过程确保该地点适合建造,并帮助识别在建造过程中可能出现的潜在问题。测量师使用各种工具和技术来测量土地的尺寸和地形,这对于创建准确的蓝图至关重要。一旦土地被测量,site work的下一阶段通常是清理该区域。这涉及移除任何可能妨碍施工的树木、灌木或杂物。仔细进行这一步骤非常重要,以避免破坏环境或干扰当地野生动物。在某些情况下,可能需要获得许可证以移除某些植物或树木,这突显了遵守当地法规的重要性。清理现场后,开始挖掘。这一阶段的site work涉及挖掘地下,以为建筑、地下室或其他结构创建基础。挖掘需要重型机械和熟练的操作工,以确保安全和高效地完成工作。挖掘的深度和尺寸取决于正在建造的结构类型以及现场的土壤条件。一旦挖掘完成,下一步是安装水、电和污水系统等公用设施。这一方面的site work至关重要,因为它为建筑完成后的功能奠定基础。正确安装这些公用设施可以防止未来的问题,并确保居住者的安全和舒适。在公用设施安装后,建筑物的实际施工开始。这通常是site work中最明显的部分,因为工人们搭建墙壁、屋顶和其他结构元素。在这一阶段,不同工种之间的协调至关重要。电工、管道工和木匠必须合作,以确保他们各自的安装不会相互干扰。主要结构完成后,添加最后的修饰。这包括内部工作,如干墙安装、绘画和地板,以及外部工作,如园艺和铺路。这些最后的site work步骤对美观和功能性都很重要。它们将一个原始的施工现场转变为一个满足用户需求的完工建筑。总之,site work是一个综合术语,概括了在施工现场发生的所有活动。从测量和清理土地到挖掘和最终修饰,每一步对于建筑项目的成功完成都是至关重要的。深入理解site work使建筑专业人员能够预见挑战并有效协调,最终导致更安全和更高效的建筑实践。