short term load
简明释义
短期载荷
英英释义
Short term load refers to the demand for electrical power or energy over a brief period, typically ranging from a few minutes to a few days. | 短期负载是指在短时间内(通常从几分钟到几天)对电力或能量的需求。 |
例句
1.To ensure reliability, the grid must accommodate the short term load 短期负荷 variations.
为了确保可靠性,电网必须适应短期负荷的变化。
2.Engineers are analyzing data to predict the short term load 短期负荷 for the upcoming month.
工程师正在分析数据,以预测下个月的短期负荷。
3.The utility company has implemented strategies to manage short term load 短期负荷 fluctuations.
公用事业公司已实施策略来管理短期负荷波动。
4.The power plant must be prepared to handle the short term load 短期负荷 during peak hours.
发电厂必须准备好在高峰时段处理短期负荷。
5.During the summer, the short term load 短期负荷 increases significantly due to air conditioning usage.
在夏季,由于空调的使用,短期负荷显著增加。
作文
In the field of electrical engineering, the term short term load refers to the temporary demand for electricity over a brief period. This concept is crucial when planning and managing power systems, as it helps utilities understand how much energy will be required at any given moment. The short term load can fluctuate significantly due to various factors such as time of day, weather conditions, and seasonal changes. For instance, during peak hours in the evening, the short term load tends to increase as people return home from work and turn on lights, appliances, and heating or cooling systems.Understanding the short term load is essential for energy providers to ensure that they can meet consumer demand without overloading the system. If the short term load is underestimated, it can lead to blackouts or brownouts, which are detrimental to both consumers and businesses. On the other hand, overestimating the short term load can result in wasted resources and increased costs.To manage the short term load, utilities often use advanced forecasting techniques. These methods may involve analyzing historical data, utilizing weather predictions, and employing machine learning algorithms to predict future demands accurately. By understanding patterns in the short term load, utilities can optimize their energy generation and distribution strategies, ensuring that they have enough power available when needed.Moreover, technological advancements have introduced smart grids, which enhance the ability to monitor and manage the short term load. Smart meters provide real-time data on energy consumption, allowing consumers to adjust their usage based on current demand levels. This not only helps in balancing the short term load but also encourages energy conservation among users.In addition to traditional energy sources, the integration of renewable energy into the grid has also impacted the short term load. Solar and wind energy production can be variable, so it is crucial to forecast their contributions accurately. During sunny or windy days, the short term load might be met with less reliance on fossil fuels, while cloudy or calm periods might necessitate a different approach. Therefore, understanding the interplay between renewable energy sources and the short term load is vital for creating a sustainable energy future.In conclusion, the concept of short term load plays a significant role in the efficiency and reliability of power systems. As energy demands continue to evolve, the ability to accurately predict and manage the short term load will be increasingly important. By leveraging technology and innovative practices, utilities can ensure that they meet consumer needs while also promoting sustainability and reducing environmental impact. The future of energy management will undoubtedly rely on our understanding of the short term load and our ability to adapt to its fluctuations.
在电气工程领域,短期负载(short term load)一词指的是在短时间内对电力的临时需求。这个概念在规划和管理电力系统时至关重要,因为它帮助公用事业公司了解在任何给定时刻所需的能源量。短期负载(short term load)可能会因多种因素而显著波动,例如一天中的时间、天气条件和季节变化。例如,在傍晚高峰时段,随着人们下班回家并开启灯光、电器及供暖或制冷系统,短期负载(short term load)往往会增加。了解短期负载(short term load)对于能源供应商确保能够满足消费者需求而不超负荷系统至关重要。如果低估了短期负载(short term load),可能会导致停电或降压,这对消费者和企业都是有害的。另一方面,过高估计短期负载(short term load)则可能导致资源浪费和成本增加。为了管理短期负载(short term load),公用事业公司通常会使用先进的预测技术。这些方法可能涉及分析历史数据、利用天气预测以及采用机器学习算法来准确预测未来的需求。通过理解短期负载(short term load)的模式,公用事业公司可以优化其能源生产和分配策略,确保在需要时有足够的电力可用。此外,技术进步引入了智能电网,这增强了监测和管理短期负载(short term load)的能力。智能电表提供实时的能耗数据,使消费者能够根据当前的需求水平调整其使用。这不仅有助于平衡短期负载(short term load),还鼓励用户节能。除了传统能源外,可再生能源的整合也影响了短期负载(short term load)。太阳能和风能的生产可能是可变的,因此准确预测它们的贡献至关重要。在阳光明媚或有风的日子里,短期负载(short term load)可能会减少对化石燃料的依赖,而在阴云密布或风平浪静的时期可能需要采取不同的方法。因此,理解可再生能源与短期负载(short term load)之间的相互作用对于创造可持续的能源未来至关重要。总之,短期负载(short term load)的概念在电力系统的效率和可靠性中发挥着重要作用。随着能源需求的不断演变,准确预测和管理短期负载(short term load)的能力将变得愈发重要。通过利用技术和创新实践,公用事业公司可以确保满足消费者需求,同时促进可持续发展,减少环境影响。能源管理的未来无疑将依赖于我们对短期负载(short term load)的理解以及我们适应其波动的能力。