field erection

简明释义

现场安装

英英释义

Field erection refers to the assembly or construction of structures, equipment, or components on-site at a location away from a factory or manufacturing facility.

现场安装是指在远离工厂或制造设施的地点进行结构、设备或组件的组装或建造。

例句

1.During the project, we encountered several challenges related to field erection of the steel framework.

在项目过程中,我们遇到了与钢框架的现场安装相关的几个挑战。

2.The construction team was trained in the process of field erection to minimize delays on site.

施工团队接受了现场安装的培训,以减少现场的延误。

3.The company specializes in field erection of large industrial structures.

该公司专注于大型工业结构的现场安装

4.Safety protocols are crucial during field erection to ensure worker protection.

现场安装过程中,安全协议至关重要,以确保工人的安全。

5.The engineers proposed a new method for field erection that could save time and materials.

工程师提出了一种新的现场安装方法,可以节省时间和材料。

作文

In the realm of construction and engineering, specific terminology is crucial for effective communication. One such term is field erection, which refers to the assembly of structures or components directly on the construction site rather than in a factory setting. This process is vital for large-scale projects such as bridges, buildings, and industrial facilities where components may be too large or cumbersome to transport as a single unit. Understanding the implications and procedures involved in field erection is essential for professionals in the industry.The process of field erection typically begins with careful planning and design. Engineers must consider various factors such as site conditions, weather patterns, and the logistics of transporting materials to the site. Once the design is finalized, the necessary materials are gathered, and preparations for the actual erection can commence. This stage often involves site preparation, which includes clearing the area, laying foundations, and ensuring that all safety measures are in place.One of the significant advantages of field erection is the flexibility it offers. Unlike factory-built components, which may require precise measurements and specifications, field-erected structures can be adjusted on-site to accommodate any unforeseen challenges. For instance, if a particular component does not fit as expected, crews can make modifications quickly, minimizing delays and keeping the project on schedule.However, field erection also comes with its own set of challenges. Weather can be a significant factor; rain, snow, or extreme heat can hinder progress and affect the safety of workers on-site. Additionally, coordinating the various teams involved in the erection process—such as crane operators, welders, and safety inspectors—requires meticulous organization and communication. Any miscommunication can lead to costly mistakes or accidents, highlighting the importance of teamwork and clear protocols in the field.Safety is paramount during field erection. Workers are often exposed to heights and heavy machinery, making it essential to adhere to strict safety regulations. Personal protective equipment (PPE) must be worn at all times, and regular safety drills should be conducted to ensure that all personnel are prepared for emergencies. Implementing a culture of safety not only protects workers but also contributes to the overall success of the project.Moreover, the completion of field erection marks a significant milestone in any construction project. Once the structure is erected, teams can move on to the next phases of construction, such as installing utilities, finishing interiors, and conducting inspections. The successful execution of field erection is often a testament to the skill and dedication of the entire construction team.In conclusion, field erection is a critical aspect of construction that requires careful planning, coordination, and a strong emphasis on safety. By understanding the processes involved and the challenges faced, professionals in the field can better prepare for the complexities of erecting structures on-site. As the industry continues to evolve, mastering the concept of field erection will remain essential for engineers, contractors, and workers alike. Through collaboration and a commitment to excellence, the construction industry can continue to build the infrastructure that supports our communities and economies.

在建筑和工程领域,特定术语对于有效沟通至关重要。其中一个术语是field erection,指的是在施工现场而不是在工厂环境中直接组装结构或组件的过程。这个过程对大型项目(如桥梁、建筑物和工业设施)至关重要,因为这些组件可能太大或笨重,无法作为单个单元运输。理解field erection涉及的含义和程序对行业专业人士至关重要。field erection的过程通常始于仔细的规划和设计。工程师必须考虑各种因素,例如现场条件、天气模式以及将材料运输到现场的后勤。一旦设计最终确定,就会收集必要的材料,并开始实际搭建的准备阶段。这一阶段通常涉及现场准备,包括清理区域、铺设基础并确保所有安全措施到位。field erection的一个重大优势是它所提供的灵活性。与工厂制造的组件需要精确的测量和规格不同,现场搭建的结构可以在现场进行调整,以适应任何不可预见的挑战。例如,如果某个组件未按预期安装,工作人员可以快速进行修改,最小化延误,保持项目进度。然而,field erection也带来了自身的一系列挑战。天气可能是一个重要因素;雨、雪或极端高温可能会阻碍进度并影响现场工人的安全。此外,协调参与搭建过程的各个团队,如起重机操作员、焊工和安全检查员,需要细致的组织和沟通。任何沟通不畅都可能导致成本高昂的错误或事故,突显了团队合作和明确协议在现场的重要性。在field erection过程中,安全至关重要。工人常常面临高度和重型机械的风险,因此必须严格遵守安全规定。个人防护装备(PPE)必须始终佩戴,并应定期进行安全演练,以确保所有人员为紧急情况做好准备。实施安全文化不仅保护工人,还促进整个项目的成功。此外,field erection的完成标志着任何建筑项目的重要里程碑。一旦结构搭建完成,团队就可以进入施工的下一个阶段,例如安装公用设施、完成内部装修和进行检查。成功执行field erection通常是整个施工团队技能和奉献精神的证明。总之,field erection是建筑中一个关键方面,需要仔细的规划、协调和对安全的高度重视。通过理解涉及的过程和面临的挑战,行业专业人士可以更好地为现场搭建结构的复杂性做好准备。随着行业的不断发展,掌握field erection的概念将继续对工程师、承包商和工人至关重要。通过合作和对卓越的承诺,建筑行业可以继续建设支持我们社区和经济的基础设施。

相关单词

erection

erection详解:怎么读、什么意思、用法