erection procedure

简明释义

安装程序

英英释义

A systematic process or series of steps undertaken to assemble, install, or construct a structure or equipment.

一系列系统化的步骤,用于组装、安装或构建一个结构或设备。

In engineering and construction, it refers to the procedures involved in the erection of buildings, bridges, or other large structures.

在工程和建筑中,指的是建造建筑物、桥梁或其他大型结构时所涉及的程序。

例句

1.The engineer explained the erection procedure to ensure safety during the construction of the building.

工程师解释了竖立程序以确保建筑施工期间的安全。

2.During the training session, the supervisor emphasized the importance of following the erection procedure precisely.

在培训会议中,主管强调了准确遵循竖立程序的重要性。

3.Before starting the project, we reviewed the erection procedure to avoid any potential hazards.

在开始项目之前,我们审查了竖立程序以避免潜在的危险。

4.The manual outlines the erection procedure step-by-step for all workers on site.

手册逐步概述了所有现场工人的竖立程序

5.We encountered difficulties during the erection procedure due to unexpected weather conditions.

由于意外的天气条件,我们在竖立程序中遇到了困难。

作文

The term erection procedure refers to the series of steps and methods that are followed to construct or assemble a structure, particularly in the context of buildings or large-scale installations. Understanding this concept is crucial for architects, engineers, and construction workers alike. The erection procedure involves careful planning and execution to ensure the safety and stability of the final structure. First and foremost, the planning phase is essential. During this stage, engineers assess the site where the structure will be built. They consider various factors such as the soil type, weather conditions, and environmental impact. This initial assessment helps in determining the appropriate materials and techniques needed for the erection procedure. For instance, if the ground is unstable, additional support may be required to ensure that the structure can withstand loads and resist potential shifts. Once the planning is complete, the next step in the erection procedure is the preparation of the site. This includes clearing the area of any debris, leveling the ground, and marking the layout of the building. Proper site preparation is vital as it sets the foundation for a successful construction process. If the site is not adequately prepared, it can lead to complications during the actual erection of the structure. After the site is prepared, the actual construction begins. This phase of the erection procedure typically starts with laying the foundation. A strong foundation is critical as it supports the entire weight of the building. Depending on the design and size of the structure, different types of foundations may be used, such as slab, crawl space, or basement foundations. Each type has its own set of requirements and considerations that must be adhered to during the erection procedure. Following the foundation, the next steps involve erecting the framework of the building. This includes installing columns, beams, and walls. The use of cranes and other heavy machinery is often necessary during this phase to lift and position large components safely. Safety protocols are paramount during this part of the erection procedure, as workers are often operating at significant heights and handling heavy materials. As the structure begins to take shape, various systems such as plumbing, electrical, and HVAC (heating, ventilation, and air conditioning) are integrated into the building. These systems must be carefully planned and executed to ensure they function efficiently within the completed structure. The integration of these systems is an essential aspect of the overall erection procedure, as they contribute to the functionality and comfort of the building. Finally, once the main structure is completed, finishing touches such as roofing, siding, and interior fixtures are added. This final phase of the erection procedure is where the building transforms from a skeletal framework into a fully functional space. Inspections are conducted throughout the entire process to ensure compliance with building codes and safety standards. In conclusion, the erection procedure is a comprehensive process that requires meticulous attention to detail and adherence to safety protocols. From planning and site preparation to the actual construction and finishing touches, each step plays a vital role in the successful completion of a building. Understanding the erection procedure is essential for anyone involved in the construction industry, as it lays the foundation for creating safe and durable structures.

术语erection procedure指的是构建或组装结构的一系列步骤和方法,特别是在建筑物或大型设施的上下文中。理解这个概念对建筑师、工程师和建筑工人来说至关重要。erection procedure涉及仔细的规划和执行,以确保最终结构的安全性和稳定性。首先,规划阶段是至关重要的。在这一阶段,工程师评估将要建造结构的地点。他们考虑各种因素,如土壤类型、天气条件和环境影响。这一初步评估有助于确定在erection procedure中所需的适当材料和技术。例如,如果地面不稳定,可能需要额外的支持,以确保结构能够承受负荷并抵抗潜在的位移。规划完成后,erection procedure的下一步是准备现场。这包括清理区域内的任何杂物、平整土地以及标记建筑的布局。适当的现场准备至关重要,因为它为成功的施工过程奠定了基础。如果现场没有得到充分准备,可能会在实际结构的搭建过程中导致复杂的问题。在现场准备好之后,实际建设开始。erection procedure的这一阶段通常从打地基开始。坚固的基础至关重要,因为它支撑着整个建筑的重量。根据结构的设计和大小,可以使用不同类型的基础,例如平板基础、爬行空间基础或地下室基础。每种类型都有自己的一套要求和考虑事项,必须遵循这些要求和考虑事项,以确保erection procedure的顺利进行。在基础完成后,接下来的步骤涉及搭建建筑的框架。这包括安装柱子、梁和墙壁。在这一阶段,通常需要使用起重机和其他重型机械,以安全地提升和定位大型组件。在erection procedure的这一部分,安全协议至关重要,因为工人往往在高处操作并处理重型材料。随着结构开始成形,管道、电气和暖通空调(HVAC)等各种系统被集成到建筑中。这些系统必须经过精心规划和执行,以确保它们在完成的结构中高效运行。这些系统的集成是整体erection procedure的重要方面,因为它们有助于建筑的功能性和舒适性。最后,一旦主结构完成,就会添加屋顶、外墙和内部配件等最终修饰。这一阶段是erection procedure的最后一步,建筑从骨架框架转变为一个功能齐全的空间。在整个过程中都会进行检查,以确保符合建筑规范和安全标准。总之,erection procedure是一个全面的过程,需要极其细致的关注细节和遵循安全协议。从规划和现场准备到实际施工和最终修饰,每一步在建筑的成功完成中都发挥着至关重要的作用。理解erection procedure对任何参与建筑行业的人来说都是必不可少的,因为它为创建安全耐用的结构奠定了基础。

相关单词

erection

erection详解:怎么读、什么意思、用法

procedure

procedure详解:怎么读、什么意思、用法