dam site
简明释义
坝址
英英释义
例句
1.Construction at the dam site is expected to be completed by next year.
在大坝工地的施工预计将在明年完成。
2.Local wildlife has adapted well to the changes around the dam site.
当地野生动物已很好地适应了大坝工地周围的变化。
3.The water level behind the dam site has risen significantly after the recent rains.
最近的降雨使得大坝工地后方的水位显著上升。
4.The engineers conducted a thorough inspection of the dam site to ensure safety.
工程师对大坝工地进行了全面检查,以确保安全。
5.Visitors are welcome to tour the dam site and learn about its history.
游客可以参观大坝工地,了解其历史。
作文
The construction of a dam is a significant engineering feat that can transform the surrounding landscape. A key aspect of this process is the selection of an appropriate dam site. The dam site refers to the specific location where the dam will be built, and its selection is critical for the success of the project. Several factors must be considered when choosing a dam site, including geological stability, water flow, and environmental impact.Firstly, the geological characteristics of the proposed dam site are paramount. Engineers must conduct thorough geological surveys to ensure that the ground can support the weight of the dam and withstand potential natural disasters such as earthquakes. A stable foundation is essential for the longevity and safety of the dam. If the dam site is located in an area with unstable soil or rock formations, it could lead to catastrophic failures, resulting in loss of life and property.Secondly, the hydrology of the area must be analyzed. The dam site should be positioned in a location that allows for optimal water flow management. This involves studying river patterns, seasonal changes in water levels, and potential flooding risks. An ideal dam site would be one that can efficiently control water flow, providing benefits such as irrigation, drinking water supply, and flood control.Additionally, the environmental impact of constructing a dam at a specific dam site cannot be overlooked. Dams can significantly alter local ecosystems, affecting wildlife habitats and plant life. It is crucial to assess how the dam will influence the surrounding environment and to implement measures to mitigate negative effects. Environmental studies often accompany the planning phase to ensure that the dam site chosen will not lead to irreversible damage to the ecosystem.Moreover, the social implications of a dam site must also be considered. Many dams are built in areas that may displace local communities. It is essential to engage with these communities during the planning process to address their concerns and ensure that they are compensated fairly for any disruption to their lives. The selection of a dam site should involve public consultations and transparent decision-making processes to foster trust and cooperation between stakeholders.In conclusion, the selection of a dam site is a multifaceted process that requires careful consideration of geological, hydrological, environmental, and social factors. A well-chosen dam site can lead to successful water management and provide numerous benefits to communities, while a poorly chosen site can result in disaster. Therefore, engineers and planners must work diligently to evaluate potential dam sites thoroughly before moving forward with construction. By doing so, they can ensure that the dam serves its intended purpose without causing harm to the environment or local populations.
大坝的建设是一项重要的工程壮举,可以改变周围的景观。这个过程的一个关键方面是选择合适的大坝地点。大坝地点指的是将要建造大坝的具体位置,其选择对于项目的成功至关重要。在选择大坝地点时,必须考虑多个因素,包括地质稳定性、水流和环境影响。首先,拟建大坝地点的地质特征至关重要。工程师必须进行彻底的地质勘查,以确保地面能够支撑大坝的重量,并能抵御潜在的自然灾害,例如地震。稳定的基础对大坝的长期使用和安全至关重要。如果大坝地点位于土壤或岩石结构不稳定的区域,可能会导致灾难性的失败,造成生命和财产的损失。其次,必须分析该地区的水文情况。大坝地点应位于能够优化水流管理的位置。这涉及研究河流的模式、季节性水位变化和潜在的洪水风险。理想的大坝地点应该能够有效控制水流,提供灌溉、饮用水供应和防洪等好处。此外,在特定的大坝地点建设大坝的环境影响也不能被忽视。大坝可以显著改变当地生态系统,影响野生动物栖息地和植物生命。评估大坝将如何影响周围环境至关重要,并实施措施以减轻负面影响。环境研究通常伴随规划阶段进行,以确保所选择的大坝地点不会对生态系统造成不可逆转的损害。此外,大坝地点的社会影响也必须考虑。许多大坝建造在可能会使当地社区搬迁的区域。与这些社区进行交流,解决他们的担忧,并确保他们因生活中任何干扰而获得公平补偿,这一点至关重要。大坝地点的选择应涉及公众咨询和透明的决策过程,以促进利益相关者之间的信任与合作。总之,选择大坝地点是一个多方面的过程,需要仔细考虑地质、水文、环境和社会因素。选择得当的大坝地点可以实现成功的水管理,并为社区提供众多好处,而选择不当的地点则可能导致灾难。因此,工程师和规划人员必须努力全面评估潜在的大坝地点,然后再推进建设。通过这样做,他们可以确保大坝达到预期目的,而不对环境或当地居民造成伤害。
相关单词