erection cost

简明释义

装配费

英英释义

Erection cost refers to the expenses incurred during the process of assembling and installing structures or equipment, typically in construction or engineering projects.

竖立成本是指在建筑或工程项目中,组装和安装结构或设备过程中产生的费用。

例句

1.The erection cost was higher than anticipated due to labor shortages.

由于劳动力短缺,竖立成本高于预期。

2.The total project budget must include the erection cost for the new building.

项目的总预算必须包括新建筑的竖立成本

3.Unexpected delays can increase the erection cost significantly.

意外的延误可能会显著增加竖立成本

4.We have allocated funds specifically for the erection cost in our financial plan.

我们在财务计划中专门分配了资金用于竖立成本

5.Before finalizing the contract, we need to estimate the erection cost of the steel framework.

在最终确定合同之前,我们需要估算钢框架的竖立成本

作文

Understanding the concept of erection cost is crucial in various fields, particularly in construction and engineering. The term refers to the expenses associated with the assembly and installation of structures or components. This includes labor costs, equipment rental, transportation, and any other expenses directly related to bringing a project from the ground up to a completed state. Accurately estimating erection cost is essential for project managers and engineers as it directly impacts the overall budget and timeline of a project.In construction projects, the erection cost can vary significantly depending on several factors. These factors include the complexity of the structure, the materials used, and the location of the project. For instance, erecting a simple wooden frame house will generally have a lower erection cost compared to constructing a multi-story steel building. Additionally, geographic location plays a significant role; projects in urban areas often incur higher costs due to increased labor rates and logistical challenges.One key aspect of managing erection cost is careful planning. Prior to beginning any construction project, it is essential to conduct a thorough analysis of all potential costs. This involves breaking down the project into smaller components and estimating the costs associated with each part. By doing so, project managers can identify areas where they can save money or allocate resources more effectively.Moreover, unexpected changes during the construction phase can lead to increased erection cost. Factors such as weather delays, changes in design, or unforeseen site conditions can all contribute to rising expenses. Therefore, it is vital for project teams to maintain flexibility and have contingency plans in place to address these challenges without derailing the entire project.Another important consideration is the use of technology in reducing erection cost. Modern construction techniques, such as prefabrication and modular construction, can significantly lower the costs associated with assembly. By manufacturing components off-site and then transporting them to the location for quick assembly, companies can save both time and money. This approach not only reduces labor costs but also minimizes the risk of delays caused by adverse weather or other external factors.In conclusion, the erection cost is a fundamental aspect of any construction project that requires careful consideration and management. Understanding its implications and being proactive in planning can lead to successful project completion within budget constraints. As the construction industry continues to evolve with new technologies and methodologies, staying informed about best practices for managing erection cost will be essential for professionals in the field. Ultimately, effective management of these costs contributes to the overall success and sustainability of construction projects, ensuring that they are completed efficiently and within financial limits.

理解erection cost的概念在各个领域中都是至关重要的,特别是在建筑和工程方面。这个术语指的是与结构或组件的组装和安装相关的费用。这包括人工成本、设备租赁、运输以及与将项目从地面建设到完成状态直接相关的其他费用。准确估算erection cost对于项目经理和工程师至关重要,因为这直接影响到项目的整体预算和时间表。在建筑项目中,erection cost可能会因多个因素而显著变化。这些因素包括结构的复杂性、所用材料以及项目的位置。例如,搭建一座简单的木框架房屋通常会比建造一座多层钢结构建筑的erection cost低。此外,地理位置也起着重要作用;城市地区的项目由于劳动力成本上升和物流挑战,通常会产生更高的成本。管理erection cost的一个关键方面是仔细规划。在开始任何建筑项目之前,进行全面的潜在成本分析是必不可少的。这涉及将项目分解为较小的组成部分,并估算与每个部分相关的成本。通过这样做,项目经理可以识别出可以节省资金或更有效地分配资源的领域。此外,施工阶段的意外变化可能导致erection cost的增加。天气延误、设计变更或不可预见的现场条件等因素都可能导致费用上升。因此,项目团队必须保持灵活性,并制定应急计划,以应对这些挑战,而不影响整个项目的进展。另一个重要考虑因素是利用技术降低erection cost。现代建筑技术,如预制和模块化建筑,可以显著降低与组装相关的成本。通过在工厂内制造组件,然后将其运输到现场进行快速组装,公司可以节省时间和金钱。这种方法不仅降低了人工成本,还最小化了由于恶劣天气或其他外部因素引起的延误风险。总之,erection cost是任何建筑项目的基本方面,需要仔细考虑和管理。理解其影响并积极规划可以导致在预算限制内成功完成项目。随着建筑行业随着新技术和方法的发展而不断演变,了解管理erection cost的最佳实践对于该领域的专业人士至关重要。最终,有效管理这些成本有助于建筑项目的整体成功和可持续性,确保它们高效且在财务限制内完成。